CLIENT

KeNHA

PROJECT LOCATION

Tana River, Garissa

PROJECT TYPE

Ultra-Sonic Pulse Velocity Test

Project Description

After the removal of formwork on one of the bridge concrete beam at the Garissa site, visible honeycombing was observed on both faces of the girder. Pro-Skills Engineers Ltd was engaged to carry out an Ultrasonic Pulse Velocity (UPV) Test on the 12 m upper section of the beam, where honeycombing was observed. The purpose of the test was to evaluate the internal quality of the concrete and determine whether defects such as voids, cracks, or non-homogeneous areas existed within the section.

Execution Strategy

Phased construction planning, strict safety management, quality control systems, and integrated engineering coordination ensured timeline and cost certainty.

Project Outcome

Project delivered on schedule and within budget, achieving full operational readiness, regulatory compliance, and long-term production reliability.

Precision In Every Build

PUBLIC INFRASTRUCTURE

Cross-Hole Sonic Logging (CSL) Integrity Testing, Rwanda

RESIDENTIAL PROJECT

Geophysical Investigation - Coral Sands Luxury Apartments, Nyali

ENERGY INFRASTRUCTURE

Ultra-Sonic Pulse Velocity Test - KenGen (Olkaria Power Plant)

ENERGY INFRASTRUCTURE

Offshore Pile Driving Monitoring - Lake Water Abstraction (LWA) platform ,Buliisa ,Uganda (Oil and Gas Project by Total Energies)